Keywords for mechanical engineering Machines, lathe machines, milling machines, sharping machines, filing machines, grinding machines, gear, gear teeth, gear cutting, gear speed, gear ratio, velocity, momentum, impulse, torque, steam, acceleration, distance, displacement, air flow, boat, vehicle, fuel tank, tank, drum, petroleum tanks, tyres, roads, impact, high speed, designs, drawing, alignments, installations, table, workshop, industry, factory, damage, faults, bearing, engines, engines faults, belt pulleys, engine pulleys, industrial conveyors, automated machines, industrial machines, industrial automation, industrial robots, fan blades, fan cover, fan blades, automotive, car, detergent, washing machine, machine, door, steel, magnesium, cast steel, cast iron, foundry, metals, keys, hammer wrench, torque range, indicator, files, sand paper, dirt, dusts, corrosion, rust, cracks, fatigue, damaged, tools, equipment, hand gloves, safety, safety goggles, face shade, nose mask, steel, beam, calculations, dimensions, diameter, somersaulting, collapse, piston, crankshaft, piston rings, car body, car paint, aero plane, helicopter, flywheel, bolts and nuts, screw, mount, lift, erect, position, lubrication, friction, strength, tensile strength, compressive strength, density, viscosity, area, thickness, How to stop electric shock, why do electric shock, ways to prevent electric shock, why do building walls shock, why is my house appliances shocking me, conduit wiring, surface wiring, external wiring, underground cables, electric wires, live cable, neutral cable, electric poles, power supply, power stations, transformer, resistors, cables, ohmmeter, capacitors, home appliance, cooking stove, electrical cooking appliances, refrigerator, air condition, computer, phones, ceiling fan, rechargeable fan, wall fan, generators, sockets, plugs, junction box, control box, electric bulbs, lamp holders, electrical connections, electric circuit breaker, electrical conductors, electromagnet, temporary magnet, permanent magnet, electric motors, pumps, electrical pumps, solar system, fire outbreak, wrong wiring of house, high voltage, low voltage, ratification of electric faults, wrong connections, electric faults, damaged motor, fire services, fire hazard, electric heat, electric current, high current, high voltage, automation, system, hot, cold, height, diameter, pole diameter, faults in fan, faults in electric heater, faults in refrigerator, faults in wire connections, House designs, building designs ,gates designs, blocks types, iron doors, wooden doors, roofing woods, types of windows, iron protectors, steel rods, iron rods, granite, marble, tiles, window nets, limestone, block industries, cement, cement price, gate pillar, gate anchors, types of gate, sucker pit, types of sucker pit, how to make a sucker pit, boreholes, water, water leakage, sewage, waste bin, ceiling, types of ceiling, price of ceiling, toilet seats, toilet maintenance, toilets, building collapse, causes of building collapse, fixing of ceiling, ceiling collapse, size of blocks, calculations in building, how much a building cost, where to start block industries, cost of starting block industry, building cost, problems in building, walls, concrete walls, hard woods, soft wood, roof, roofing, roofing patterns, roofing styles, height of roofs, aluminum sheet, cost of aluminum sheets, bundle of aluminum sheet, cost aluminum roofs, different types of roofing materials, roofing nails, nails, aluminum nails, copper nails, roofing zinc, cost of roofing zinc, cheapest roofing sheets, easy way to roof a house, sucker pit chambers, toilet chambers, pipes for toilets, germane floor, flooring of a house, cost of flooring a house, amount of cements for flooring, best flooring techniques, plumbing of house, plumbing works in a building, problems with plumbing, how to plumb a house, wall plumbing, making of house pillars, making of concretes, cement and sand mixture for blocks, soil texture before starting a building, trucks for carrying cements, trucks for carrying blocks, aluminum nails (3), amount of cements for flooring (3), best business in Nigeria (3), best flooring techniques (3), blocks types (3), BMW(3), building collapse (3), building cost (3), building designs (4), bundle of aluminum sheet (3), calculations in building (3), Cars (3),causes of building collapse (3), ceiling (4), cement (4), cement and sand mixture for blocks (3), cement price (3), cheapest roofing sheets (3), concrete walls (3), cooking stove (3), cost aluminum roofs (3), cost of aluminum sheets (4), cost of flooring a house (3), cost of roofing zinc (3), Dial gauge (3), different types of roofing materials (3), easy way to roof a house (4),Electric cars (4), Engine cooling system (3), engines (4), fixing of ceiling (4), flooring of a house (3), future cars (3), future technology (3), gate pillar (3), germane floor (3), hard woods (3), height of roofs (3), House designs (4), industrial machines (5), Latest technology (10), price of ceiling (4), robots (4), roofing(4), types of ceiling (4), BASIC THINGS YOU NEED TO KNOW BEFORE INSTALLING ANY MACHINE - ENGINEERINGALL.COM

ENGINEERING, ENVIRONMENTAL DISCOVERIES, SAFETY, TECHNICAL, HOW TO, ENTREPRENEURSHIP, BUSINESS, LATEST TECHNOLOGY, LASTEST SCIENCE, QUESTION AND ANSWER (HELP FORUMS), SOFTWARE, ARTIFICIAL INTELLIGENCE, INDUSTRY, ROBOTS, DRONES, MACHINES, ENGINE,AIRCRAFT,BUILDING, CAR COMPUTER, ELECTRONICS, FOUNDRY, GMAIL. ELECTRIC FAN, MICROSOFT, NASA, OFFICE PRINTER, PLASTIC, ROAD, ROOFING SHEETS, TRACTOR, STRUCTURAL ENGINEERING, PETROLEUM ENGINEERING, METALLURGICAL ENGINEERING, MECHANICAL ENGINEERING, INDUSTRIAL ENGINEERING, ELECTRICAL ENGINEERING, CIVIL ENGINEERING, AGRICULTURAL ENGINEERING, CHEMICAL ENGINEERING,

BASIC THINGS YOU NEED TO KNOW BEFORE INSTALLING ANY MACHINE

Machine installation is an activity that takes place every day both in the industries and houses. Some diesel generators in duplex, banks, and cooperate offices are installed in the proper position since they are not mobile like most petrol or fuel generators which are always smaller in size.

Installation of these heavy machines has similar principles and procedures with just a few differences in their steps. The normal silent diesel generators used for large buildings has almost similar installation procedure with an electric motor used in the turning of centrifugal pumps in the oil and gas industries.During installation your major aim is to ensure proper position of the machine, isn’t it? You want the machine to remain in position while functioning, isn’t it? You also need maximum output from the machine, and has its noise at the minimum, isn’t it? Well, your expectations are not far provided you understand what installation is all about and the principles behind it.

When planning for installation understand the following points clearing:

PROPER INSTALLATION, leads to;

Long durability of the machine

Reduced vibration from the machine

Maximum power output

Long life span of bearings

Belts slipping off from pulleys are minimized

It helps to avoid damaged to the surrounding parts

It creates more efficiency especially in an automated system

IMPROPER INSTALLATION leads to;

Broken Foundation and loose anchor bolts

Jerking of the machine

Quick parts damage

Reduced engine life span

Frequent belt slip from pulleys

Vibrations

Sometimes noise is an evidence

Machine easily deviates from fixed position

It leads to errors in an automated system.

So with the above points, you can see how necessary it is to ensure proper installation of your machines,The basic procures for installing machines are;

FOUNDATION PREPARATION

During the foundation preparation you are required to map out enough space according to the width and breadth sizes of the machine to be installed and according to the weight of the machine add some additional feet around the obtained width and breadth of the machine and use it for the foundation preparation. The depth of the foundation depends on the size of the anchor bolts used, the type with smaller diameters need deep holes while some with big diameters need shallow holes, also according to the weight of the machine, most of them may require deep holes despite the big size of their anchor bolts diameter.

ANCHOR BOLTS SETTINGS

The next procedure is to set the anchor bolts according to the gaps at the holes located at the base of the machine meant for anchor bolts and nuts installation. Taking an accurate measurement of these gaps will ensure no stress when mounting the machine. Meanwhile, any wrong measurement could render the whole process useless and the entire installation process could be repeated over again. So in ensuring no such occurrence, it is necessary to use accurate measuring device and do re-check of the measurements periodically after each procedure until concrete is poured, even after the setting of the concrete re-check the anchor bolts, so that any minor deviation could be corrected by gently tapping on the affected bolt using soft hammer.

During this period a welded jig may be used to anchor the bolts in the required position before other works are carried out on the foundation. WOODEN BOARD MAKING

Before the pouring of concrete, there is need to form a wooden board around the area that make up the foundation, this area will be formed by the wood to ensure the foundation height and accurate sites were obtained, before pouring concrete to the area created by the wooden board, note that without this step it will not be possible for the foundation to be formed with concrete.

CONCRETE FILLING AND SETTING

The concrete is mixed with a higher concentration of cement and binders for the purpose of obtaining rigidity and strength. The mixture is then poured into the area formed by the wood without having so much flowability property, the concrete is then tapped on the surface to obtain smoothness and remove obstacles around the anchor bolts. After that, the entire foundation is left for 24hours to set and in some cases, water can be poured on the foundation during the pre-solidification stages to ensure proper closure of internal holes and help in crack reduction of the foundation when it is put to use.

MOUNTING THE MACHINE

When the foundation is set and the anchor bolts positions are verified to be in order, the next action is to remove the jig used in fixing the anchor bolts in position and then start the mounting of the machine.

The mounting of the machine can be carried out with either crane, chain blocks, movable jacks, or manual lifting all of these techniques entirely depend on the size of the machine and the experience of the personals involved.

When this process is successful, the next thing is to check for any external object or projected part at the machine base, if none then the machine is set for alignment.

ALIGNMENT SEQUENCE

During the alignment, the specified axis of the machine is cross-checked, while adjustable bolts will be attached at the locations needed for the purpose of lifting and lowering of the machine and clockwise and anticlockwise positioning of the machine. There are different techniques in machine alignment, and they can be a topic for another day. When the alignment had been completed and the required tolerance had been obtained, the next procedure is to proceed in the machine commissioning.

THEN, COMMISSIONING OF THE MACHINE

Commissioning of the machine is simply the process that takes you off the contract by handing over the machine back to your client, it is accompanied by the sequential testing and running of the machine and obtaining all the records in regard to the machine performance and comparing them to the manufacturers specification, when the whole record is according to your clients expectations, then it is time to hand over the property to the owner, and that brings the contract of installation to an end.

There are may be other minor procedures not specified in this post but for the basic, the above procedures are what you need to know.

A mechanical engineer, an NDT inspector, Graphic designer & Web developer, I love blogging and sharing of knowledge for human intellectual development, especially relating to engineering fields, environment, and science trending updates.

“Engineeringall.com” is a platform for any individual with similar passion, to do so; use the “PUBLISH YOUR ARTICLE” page at the MENU to share your personal ideas, researched knowledge, or discovered incidents, etc.to those in the engineering & science fields & the general online communities across the globe. If you love this post please share using the social buttons below.